Absafe - Special Access & Remedial Engineering

Mobile menu
loading animation
loading animation
  • + Railton & Devonport Cement Silos

    Client: Cement Australia

    Location: Railton and Devonport, TAS

    Works Completed: 2012 - Ongoing

    Structural Issues: Hardened cement causing blockage to silos.

    Scope of Work:  

    • Safe entry
    • Internal clean out
    • Confined space procedures
    • Industrial rope access

    Benefits of Rope Access:  

    • Enabled access to silos without alterations to structure
    • Safer personnel extraction than traditional methods
    • Cost effective – eliminating the need for complex scaffolding

    Job facts:

    • Cleaned out up to 5000 tonnes of cementituos build-up
    • Operating 24 hours a day to minimise offline time


    Quality, Safety & Environment:

    • Adhered to confined space entry permit procedure
    • Fatigue management
    • Long line breathable air supply

     

  • Cement Australia rope access
  • Absafe circle logo
  • Repairs to Railton and Devonport Cement
  • Cement Australia
  • Cement Australia