Structural Issues: Included cracking to top ring of 120m cooling towers, spalling concrete and corroded structural support braces, expansion joints and external cladding.
Scope of Work:
- Installation of one ton swing stage support frames
- Helicopter hover exits
- Emergency Make safe to spalling concrete
- Painting
- Welding
- Internal duct inspections and structural support brace repairs
Benefits of Rope Access:
- Cost effective – eliminating the need for complex scaffolding
- Safe and efficient
Job facts:
- Install of 1t swing stage support frames to top ring of 120m cooling tower
- Crack injection, concrete patch repair and core sampling to hyperbolic structure
- Confined space welding repairs to internal structural support braces and expansion joints
- External cladding repairs to square and round duct work including expansion joints
Quality, Safety & Environment:
- Detailed safe work method statements, rescue plans and daily safety brief
- Adhered to site specific confined space procedures
- Independent safety audits completed
- Personal gas monitoring