Structural Issues:
- Corroded, separated and missing internal duct support braces
- Delaminated and spalling concrete creating imminent fall hazards to cooling tower and stacks
- Corroded cladding support braces
Scope of Work:
- Cladding and installation repairs
- Inspections, thickness surveying & reporting
- Steel repairs and welding
- Confined space entry
- Concrete repairs
- Helicopter exit
- Rigging
- Painting
Benefits of Rope Access:
- Cost effective – eliminating the need for complex scaffolding
- Safe and efficient
Job facts:
- Inspection, rock fall protection install, make safe and painting to 180m chimney
- Confined space welding repairs and replacement of internal duct structural support braces
- Install of 1t swing stage support frames to top ring of 130m and two 115m cooling towers
- Inspection and make safe of spalling concrete to pedestrian accessible areas of 3 cooling towers
- External cladding repairs to square and round duct work including expansion joints
Quality, Safety & Environment:
- Detailed safe work method statements, rescue plans and daily safety brief
- Adhered to site specific confined space procedures
- Independent safety audits completed
- Personal gas monitoring